Service:
Construction
CITYHOTEL
Adding a lift shaft to the existing 15-storey part of the hotel in the city center. Cramped conditions around the facility made it impossible to provide the flow of concrete to the mounting height. Therefore, it was decided to make concrete structures in advance, on the ground, and to bring them to the place of installation using a crane.
Year
2017-2018
Location
Kiev, Ukraine
Function
Hotel
Type of activity
Reconstruction