TREATMENT AND DIAGNOSTIC CENTER DOBROBUT
On April 19, 2016, Dobrobut Polyclinics Medical Center was opened at 3 Mykhaila Mishyna St. in Kyiv. The said reconstruction was carried out from May 2015 to April 2016. The inactive industrial building became the base for the creation of the medical center. During the renovation, an additional unit was added to the main building, new premises were constructed and existing premises were adapted for the production needs of the medical center. The special attention had to be paid to the increased requirement for used construction materials for the purposes of sanitary and epidemiological safety.
MODUS Construction Group was one of the contractors in the renovation of the said facility. The list of operations included:
- general construction work (demolition work; installation of reinforced concrete structures, assembling of small metal elements; masonry work);
- installation of roofing structures using PVC membranes;
- installation of “wet” and suspended facades;
- installation of bases for room finishing;
- finishing of rooms.
Special attention was paid to the work on the installation of reinforced concrete monolithic foundations for modern high-precision medical equipment for CT and MRI. Allowable deviations of overall dimensions of these structures are up to 1 mm.
Also, the MODUS Construction Group has developed and implemented a land improvement project. Within the framework of this project, the company arranged entrance groups with advertising signs.
The design of the central outdoor fence is an exclusive design solution that has been successfully developed and implemented by the specialists of the Construction Group.
YEAR
2015-2016
LOCATION
3 Mykhaila Mishyna St., Kyiv
FUNCTION
Medical Center
TYPE OF ACTIVITY
Reconstruction
AREA
5 745 sq m