Service:
Construction
SPORTS COMPLEX “ENERGETIK”
During the construction of a sports complex ENERGETIK, MODUS Construction Group was one of the contractors and executed the complex of works on installation of a monolithic reinforced concrete pool basin, the concrete structures of compensation tanks and pool building walls. A feature of this work was the creation of a complex geometric shape of the basin with differences of elevation of the pool bottom and variable thickness of the walls of the basin with the installation of the overflow gutter structure.
Concreting was carried out in winter using a system of electric heating for concrete structures. A complex geometric form of all reinforced concrete structures led to the use of tailor-made casing.
Year
2014
Location
Mykolaivka, Donetsk region
Function
Sports Complex
Type of activity
New construction within the framework of reconstruction
Area
720 sq m