Service:
Construction
CITYHOTEL
CITYHOTEL reconstruction was performed as a part of general contract and included:
- dismantling of two floors, strengthening of the foundations and supporting structures;
- adding of 5 floors;
- arrangement of rooms, SPA areas, meeting rooms, an outdoor terrace with a rooftop pool and restaurant FogFactory with a summer terrace;
- landscaping
Year
2016-2018
Location
Kiev
Function
Hotel
Type of activity
Reconstruction
Area
2 700 sq m