“UNISON” INDUSTRIAL PARK AND SHOPPING MALL
MODUS Construction Group was the general contractor in construction and assembling operations for UNISON Industrial Park. The construction was carried out in two phases.
MODUS in cooperation with numerous subcontractor organizations carried out the reconstruction of 4 existing, and construction of 2 new building blocks of the Industrial Park. The presence of bulk soils over the entire area ofthe construction site led to the use of pile foundations in the construction of new buildings.
The following types of work were carried out at that facility:
- demolition work;
- excavation work;
- elimination of identified defects and damage, strengthening of building structures based on the results of technical inspections;
- installation of underground fire-prevention tanks from monolithic reinforced concrete;
- arrangement of pile fields with the use of bored piles;
- installation of the monolithic reinforced concrete bases;
- installation of metal structures of the building frame (columns, trusses and subrafter trusses, girders, beams);
- installation of the combined overlappings from metal designs and monolithic reinforced concrete;
- masonry work;
- assembling of precast concrete elements;
- assembling of small metal elements;
- construction of industrial floors using topping and polymeric coatings;
- construction of roofing structures using PVC membranes, including under ballast roofing scheme;
- installation of facades and stained glass;
- installation of reloading equipment;
- structure of engineering systems.
YEAR
2012-2013
LOCATION
Donetsk, Ukraine
FUNCTION
Logistics and shopping center
TYPE OF ACTIVITY
Reconstruction
AREA
41 629 sq m